EmergenServe, LLC BBB Business Review
    Level 2 EV charger installation on a garage wall in Moncks Corner SC

    Licensed Level 2 EV Charger Installer

    EV Charger Installation in Moncks Corner

    Moncks Corner Level 2 EV installs for Foxbank Plantation and Pinopolis lake-house additions, Berkeley Electric coordinated.

    Licensed & Insured
    Half-Day Install
    5-Star Rated
    NEC 2026 Compliant

    How much does a Level 2 EV charger installation cost in Moncks Corner, SC?

    In Moncks Corner, a permitted Level 2 EV charger installation typically runs $900 to $2,400 for straightforward newer-panel installs. Panel-at-capacity homes needing a subpanel or load management run $1,600 to $3,200. Full service upgrades combined with EV circuit run $2,800 to $4,500 total. All quotes include permit and inspection.

    (843) 754-1671, available 24/7
    Licensed installer commissioning a Tesla Wall Connector in Moncks Corner SC

    Level 2 EV Charger Installation in Moncks Corner

    Foxbank Plantation EV installs are typically newer 200A panels with room for a Level 2 addition, often paired with a standby generator ATS load-shed configuration so the charger will not overload the generator during a Dominion outage.

    Pinopolis lake-house installs often want the Level 2 in a detached garage or dock outbuilding. NEC 2026 wet-location and marine requirements apply. We install with marine-grade GFCIs and NEMA 3R enclosures.

    Downtown Moncks Corner older-home installs commonly need a 200A service upgrade first. We combine the two into a single permitted project with Berkeley County or the Town of Moncks Corner.

    What Moncks Corner EV Installs Actually Involve

    Level 2 EV charger installs in Moncks Corner succeed or fail on the NEC load calculation. A 60A Tesla Wall Connector draws 48A continuous, and on a panel already supporting a heat pump, tankless water heater, and pool equipment, that circuit will trip the main under sustained overnight charging. We diagnose real capacity with a load calc before quoting any circuit.

    When Moncks Corner panels are legitimately at capacity, a Span smart panel or DCC-10 load management device almost always solves the problem without a full service upgrade. When a service upgrade is actually needed (older 100-150A homes), we combine the upgrade with the EV circuit in a single permitted project.

    Every Moncks Corner EV install includes a whole-home Type 2 SPD to protect the charger and vehicle electronics, a labeled dedicated circuit, and photographed documentation of the finished work. Most straightforward installs are done in a half-day; combined panel-plus-EV jobs finish in a single business day.

    Our EV Charger Services:

    • Tesla Wall Connector installation
    • ChargePoint Home Flex installation
    • Wallbox, Grizzl-E, Emporia, Enphase installs
    • Hardwired 48-60A dedicated EV circuit
    • Span smart panel installation
    • DCC-10 load management device install
    • Dual-EV load-shared Level 2 install
    • EV subpanel addition with NEC load calc
    • Panel upgrade combined with EV circuit
    • Coastal-rated NEMA 3R/4X EV enclosures
    • Commercial workplace and fleet EV charging
    • Standby generator ATS load-shed integration

    Home wall chargers, outdoor charging locations, workplace stations, and electric vehicle charging inspiration. Original AI-generated illustrations, not completed EmergenServe projects or official manufacturer product photographs. Vehicle and charger details are illustrative; confirm specifications for your exact equipment.

    Home EV Charger Equipment

    Original AI-generated illustration: White oval Level 2 home EV wall charger with coiled cable and metal conduit

    Hardwired Level 2 wall charging

    A wall-mounted charging station keeps equipment within reach while preserving garage floor space.

    Original AI-generated illustration: Black rectangular home EV wall charging station with cable and connector cradle

    Connected home charging equipment

    When comparing ChargePoint, Autel, or other connected chargers, check scheduling, access controls, and Wi-Fi coverage. Equipment shown is illustrative.

    Original AI-generated illustration: Compact dark square EV charger mounted beside a garage parking space

    Compact smart charger planning

    For Wallbox, Emporia, and other compact chargers, compare circuit requirements, load-management support, and cable length. Equipment shown is illustrative.

    Original AI-generated illustration: Silver wall-mounted EV charger with stored cable beneath a coastal carport

    Outdoor-rated charging placement

    Select equipment approved for the installation environment and follow manufacturer mounting requirements.

    Charging Levels & Installation Planning

    Original AI-generated illustration: Portable EV charging cable with inline control box beside a closed garage outlet cover

    Portable Level 1 charging

    Level 1 charging uses a compatible household outlet; an electrician should assess the circuit, receptacle condition, and sustained load.

    Original AI-generated illustration: Professional electrician checking a wall-mounted home EV charging station with a tablet

    EV charging assessment

    Installation planning includes equipment selection, an electrical load calculation, and commissioning checks.

    Original AI-generated illustration: Two EV charging pedestals beside electric vehicles in a landscaped office parking lot

    Workplace Level 2 charging

    Workplace charging design considers parking duration, accessibility, power sharing, and future expansion.

    Original AI-generated illustration: Tall public DC fast charging cabinets beside an electric SUV

    Public DC fast charging

    DC fast charging serves road-trip and high-turnover sites and requires different infrastructure from residential Level 2 charging.

    Premium Electric Vehicle Charging Inspiration

    Original AI-generated illustration: Silver Porsche Taycan-inspired electric sports sedan beside a garage wall charger

    Porsche Taycan charging inspiration

    Plan home AC charging around your vehicle’s onboard charger and overnight parking routine.

    Original AI-generated illustration: Green Porsche Macan Electric-inspired SUV beside a coastal home wall charger

    Porsche Macan Electric charging inspiration

    An outdoor charging location needs suitable equipment ratings, cable reach, and accessible parking.

    Original AI-generated illustration: Blue BMW i4-inspired electric coupe parked beside a compact garage EV charger

    BMW i4 home charging inspiration

    A dedicated Level 2 circuit can replenish everyday driving during an overnight charging window.

    Original AI-generated illustration: White Lucid Air-inspired luxury electric sedan beside a driveway charging station

    Lucid Air charging inspiration

    Size your charging setup around daily miles rather than the vehicle’s maximum public charging rate.

    Original AI-generated illustration: Dark BMW iX-inspired electric SUV parked beside a garage wall-mounted EV charger

    BMW iX charging inspiration

    Larger electric SUVs benefit from a charging plan that considers battery capacity and available panel headroom.

    Original AI-generated illustration: Silver Mercedes-Benz EQS-inspired electric sedan beside a coastal driveway charger

    Mercedes-Benz EQS charging inspiration

    Choose the charger connector and output for your exact vehicle model year and market.

    Original AI-generated illustration: Green Rivian R1S-inspired electric SUV parked beside an outdoor charging pedestal

    Rivian R1S charging inspiration

    Pedestal placement can bring charging closer to a driveway parking space without stretching the cable.

    Original AI-generated illustration: White Audi Q8 e-tron-inspired electric SUV beside a carport wall charger

    Audi Q8 e-tron charging inspiration

    A covered charging area still needs equipment suitable for its actual moisture and weather exposure.

    Original AI-generated illustration: Red Tesla Model 3-inspired electric sedan connected to a garage wall charging station

    Tesla Model 3 charging inspiration

    Check connector compatibility and circuit capacity before choosing a home charging station.

    Original AI-generated illustration: Gray Tesla Model Y-inspired electric crossover parked beside a coastal home charger

    Tesla Model Y charging inspiration

    Route the charging cable away from walking paths and allow enough reach for your normal parking position.

    Original AI-generated illustration: Blue Ford F-150 Lightning-inspired electric pickup beside a residential garage charger

    Electric pickup home charging

    Electric truck charging plans should consider daily mileage, towing use, and the time available at home.

    Original AI-generated illustration: Teal Hyundai Ioniq 5-inspired electric crossover beside a white garage wall charger

    Electric crossover garage charging

    Compare home AC charging needs separately from the vehicle’s advertised DC fast-charging capability.

    Our Moncks Corner EV Install Process

    Load Calc & Design

    We photograph your Moncks Corner panel, run an NEC load calculation, and design the EV circuit with the right conductor size, breaker, and load management if needed.

    Permit & Install

    We pull the Moncks Corner permit, run the conductor, install the hardwired Level 2 unit or subpanel, and integrate any Span smart panel or DCC-10 load management device.

    Commission & Document

    We commission the charger, verify full-current sustained load, meet the inspector, and hand you a photographed record of the finished work for insurance and closing.

    What You Should Know Before Your Moncks Corner EV Install

    A few things every Moncks Corner EV buyer should know before an installer walks in. If any of these apply, an on-site load calc is the right first step.

    Load Calculation Matters

    A Moncks Corner 200A panel already supporting a heat pump, tankless, and pool may not accept a 60A EV circuit without load management. NEC load calc first, quote second.

    Hardwired Beats Plug-In

    Hardwired Level 2 units run faster (48A vs 32A), last longer, and are safer in Moncks Corner coastal environments than NEMA 14-50 plug-in installs. We recommend hardwired on nearly every install.

    Wire Size Is Non-Negotiable

    A 60A EV circuit requires 6 AWG copper. Long runs from panel to garage in older Moncks Corner homes may need conduit-hardened THHN or aluminum sized up to compensate for voltage drop.

    Whole-Home SPD Included

    Every Moncks Corner EV install we finish includes a whole-home Type 2 SPD to protect the charger and vehicle electronics against Lowcountry lightning damage.

    Span Smart Panel Or DCC-10

    When your Moncks Corner panel is at capacity, a Span smart panel or DCC-10 load management device almost always avoids a full service upgrade. We install both.

    Coastal Hardware Is Real

    Salt-air Moncks Corner installs (IOP, Sullivan's, Old Village) need NEMA 3R stainless or NEMA 4X enclosures and marine-grade conduit. Standard indoor units fail here inside 5 years.

    EV Charger Installs Across Moncks Corner Neighborhoods

    Foxbank Plantation

    Newer 200A EV additions with generator ATS load-shed integration.

    Pinopolis & Lake Moultrie waterfront

    Dock-side and detached-garage Level 2 with marine-grade GFCIs and NEMA 3R enclosures.

    Downtown Moncks Corner

    1930s-50s service upgrades combined with EV circuit as a single permitted project.

    Cordesville & rural Moncks Corner

    Rural service rebuild EV installs, Berkeley Electric coordinated.

    Recent Moncks Corner Projects

    Local EV Charger Installation Work We've Done in Moncks Corner

    A snapshot of recent permitted Level 2 EV charger installation projects we've delivered for Moncks Corner homeowners and businesses.

    Foxbank Plantation

    Foxbank Generator + EV Load-Shed

    Configured 22kW Kohler ATS with EV load-shed relay; installed 60A Tesla Wall Connector.

    OutcomeFull test transfer verified; Berkeley County inspection cleared.

    Pinopolis

    Pinopolis Detached Garage Level 2

    NEMA 3R stainless coastal-rated Level 2 in detached garage with marine-grade GFCI and NEC 2026 wet-location protection.

    OutcomeBerkeley County inspection cleared first visit.

    Downtown Moncks Corner

    Downtown Moncks Corner 200A + EV

    1935 home 100A-to-200A upgrade combined with 60A Level 2 subpanel.

    OutcomeTown of Moncks Corner cleared same day.

    Permits & Inspections

    Moncks Corner EV Charger Installation Permitting

    Electrical work in Moncks Corner is permitted through the Town of Moncks Corner Building & Zoning. As the licensed contractor of record, EmergenServe files the permit, schedules the inspection, and meets the inspector on-site so the work is documented and code-compliant.

    Located at 118 Carolina Avenue. Berkeley County Building Inspections handles unincorporated addresses; both jurisdictions issue residential electrical permits within 1-2 business days.

    Verified Google Reviews

    What Lowcountry Customers Say About EmergenServe

    Our most recent verified Google reviews from across the greater Charleston area. Ask about local Moncks Corner references at your estimate.

    He was very quick to react, even on a Sunday evening, and was here Monday morning with an estimate and came at 3 PM that afternoon to get my electric vehicle charger installed. Very friendly great service.

    Nat Wallen

    2 days ago

    I first called a company that was clearly AI, that was not the case with Emergenserve. I called and talked to an actual person. He answered at 9:00pm and was at my house the next morning at 8:30am. Extremely professional, fair prices, and gets the job done! 5 star work all day long!!!! Can’t recommend enough.

    Zachary Strack

    1 week ago

    Excellent response time and a human actually answered the phone. Ready to help me with my electrical problem they made me a same day appointment. Showed up on time and immediately went to work. The technician explained to me the problem and fixed it quickly. I highly recommend their service!

    Michael DeLeon

    1 week ago

    Our Moncks Corner Electricians In Action

    Real work from real jobs across Moncks Corner and the Charleston Lowcountry, from panel upgrades to storm night emergencies.

    Licensed EmergenServe electrician installing a 200 amp electrical panel upgrade in a Moncks Corner SC home with copper feeders and labeled breakers
    200 Amp Panel Upgrade
    200 amp panel upgrades and service changes for Moncks Corner homes, permitted and inspection ready.
    EmergenServe electrician installing a Level 2 Tesla EV charger and 60 amp circuit on a Mount Pleasant garage wall
    Level 2 EV Charger Install
    Level 2 EV charger installs on Tesla, ChargePoint, and universal J1772 units across Moncks Corner.
    Two EmergenServe electricians setting a Generac whole home standby generator on a concrete pad beside a Lowcountry brick home
    Whole Home Standby Generator
    Whole home standby generator installs and transfer switch wiring, storm ready for Moncks Corner outages.
    EmergenServe electrician installing dimmable LED recessed can lights in a bright Charleston kitchen ceiling with clean drywall cutouts
    LED Recessed Lighting
    Dimmable LED recessed lighting layouts for Moncks Corner kitchens, living rooms, and vaulted ceilings.
    EmergenServe emergency electrician troubleshooting an outdoor meter base and main panel at night during a Charleston thunderstorm power outage
    24/7 Emergency Electrician
    24/7 emergency electrician response for storm damage, dead panels, and burning smells in Moncks Corner.
    EmergenServe commercial electrician pulling THHN conductors through overhead cable tray during a downtown Charleston restaurant build out
    Commercial Wiring & Cable Pulls
    Commercial wiring, cable tray, and tenant build outs for Moncks Corner restaurants, retail, and offices.
    Local, Not Templated

    Why Moncks Corner EV Charger Installation Is Different Than Anywhere Else

    Moncks Corner is Berkeley County's seat and the northern edge of our regular service area, and it is unlike any other town we cover. Berkeley Electric Cooperative is headquartered here, so utility coordination is uniquely fast. The housing stock spans century-old downtown homes, 1970s ranches, 1990s subdivisions like Fairlawn and Ridgeville Estates, and a wave of new construction along Highway 52 and Old Highway 6 driving toward Lake Moultrie and Cross. Cypress Gardens, Old Santee Canal Park, and the Berkeley County judicial complex generate the commercial mix.

    Moncks Corner Housing Stock, By Neighborhood

    Downtown Moncks Corner (Main Street, Live Oak Avenue)

    1900 through 1950. Wood-frame homes on crawl or short pier, many with knob-and-tube still in the attic and 60- or 100-amp fuse panels on the exterior. Insurance underwriters will not renew a policy with active K&T, so most of our downtown Moncks Corner work is section rewires paired with a service upgrade.

    Fairlawn, Ridgeville Estates, Whitesville Road

    1970 through 1990 ranches and split-levels. Federal Pacific and Zinsco panels are the dominant replacement candidate. Aluminum branch wiring in a subset of the late-70s builds, which we pigtail with AlumiConn or replace with CO/ALR-rated devices.

    Foxbank Plantation, Spring Grove, and the Highway 52 corridor

    2005 forward tract and semi-custom homes. Copper, 200-amp Cutler-Hammer BR or Square D Homeline panels. Common calls are EV chargers, whole-home generators (this is well-and-septic country, so a generator is not optional in hurricane season), and dedicated circuits for hot tubs and detached workshops.

    Lake Moultrie waterfront and dock power

    Old Santee Canal, Bushy Park, and the Lake Moultrie shoreline off Highway 52. Dock power, boat lift circuits, marine-grade receptacles, and shoreline lighting. Freshwater rather than salt, but the same code-heavy scope of work.

    Electrical Issues We See Weekly in Moncks Corner

    Berkeley Electric Cooperative headquarters advantage

    Berkeley Electric is headquartered here, and their disconnect and reconnect queue for Moncks Corner is the fastest in the tri-county. Most standard service upgrades can be coordinated in 1 to 2 business days rather than the 3 to 5 we see farther out.

    Well pump and septic control replacements

    Most Moncks Corner homes outside the town limits are on well and septic. Submersible pump replacements, pressure switch failures, and septic pump control panel work are a routine part of our week here.

    Generator demand during hurricane season

    Well pumps mean no water when the power goes out. Standby generator installs peak in June and July every year as owners realize a hurricane-season outage is not just an inconvenience but a water-out event. We book the peak season out weeks in advance.

    Downtown knob-and-tube and insurance non-renewals

    Downtown Moncks Corner homes get flagged by underwriters for active K&T with increasing frequency. Section rewires paired with a service upgrade resolve both the safety and the underwriting issue.

    Recent Moncks Corner Jobs, In Detail

    Section rewire and service upgrade, Live Oak Avenue

    Removed knob-and-tube from the attic and second-floor bedrooms of a 1918 home, upgraded from a 60-amp fuse panel to a 200-amp Square D QO, added AFCI/GFCI throughout, coordinated Berkeley Electric disconnect and reconnect same day.

    Standby generator, Foxbank Plantation

    24 kW Generac Guardian on a poured pad, propane fed with a dedicated 500-gallon buried tank, service-entrance ATS, load-shed on both HVAC compressors and the well pump. Sized to run kitchen, HVAC, and well through an extended outage.

    Aluminum-wire pigtail, Ridgeville Estates

    Full-house pigtail of aluminum branch wiring with AlumiConn connectors, replaced all devices with CO/ALR-rated units, added AFCI protection on bedroom circuits. Insurance carrier accepted the scope and renewed the policy.

    Dock power upgrade, Lake Moultrie shoreline

    New GFCI-protected dock receptacles, LED shoreline and pier lighting, boat lift disconnect and dedicated circuit. Permitted with Berkeley County and inspected on the first walk.

    What Customers Say on Google

    "He was very quick to react, even on a Sunday evening, and was here Monday morning with an estimate and came at 3 PM that afternoon to get my electric vehicle charger installed. Very friendly great service."

    Nat Wallen
    Google review · 2 days ago

    "I first called a company that was clearly AI, that was not the case with Emergenserve. I called and talked to an actual person. He answered at 9:00pm and was at my house the next morning at 8:30am. Extremely professional, fair prices, and gets the job done! 5 star work all day long!!!! Can’t recommend enough."

    Zachary Strack
    Google review · 1 week ago

    "Excellent response time and a human actually answered the phone. Ready to help me with my electrical problem they made me a same day appointment. Showed up on time and immediately went to work. The technician explained to me the problem and fixed it quickly. I highly recommend their service!"

    Michael DeLeon
    Google review · 1 week ago

    How We Get To Moncks Corner

    Moncks Corner is a 25 to 40 minute run from our North Charleston yard. We take Highway 52 north for downtown and Foxbank, or I-26 to exit 199 and cut across for the Cane Bay side. Berkeley Electric Cooperative's headquarters is in town, which keeps utility coordination fast. Emergency response is 24/7 with a stocked truck and a Berkeley County electrical inspector we know by name.

    Questions Moncks Corner Homeowners Actually Ask Us

    Who permits electrical work in Moncks Corner?

    Berkeley County Building Inspections issues electrical permits for the Town of Moncks Corner. We are a registered contractor with Berkeley County, and standard residential service change applications are typically processed same-day.

    How fast can Berkeley Electric coordinate a service upgrade here?

    Because Berkeley Electric Cooperative is headquartered in Moncks Corner, disconnect and reconnect coordination for standard residential service upgrades is often possible within 1 to 2 business days. That is faster than most of our coverage area.

    Can you handle well pump and septic control work?

    Yes. Submersible pump replacements, pressure switch failures, and septic pump control panel work are routine for us across Moncks Corner. We stock the common parts on the truck.

    How long does a whole-home generator install take?

    Most residential Generac or Kohler standby installs are completed in two working days plus a Berkeley County inspection window. Total elapsed time from contract to commissioned unit typically runs 3 to 5 weeks depending on propane tank set and gas-line coordination.

    How much does a 200-amp service upgrade cost in Moncks Corner?

    For a standard exterior meter/main configuration with Berkeley Electric coordination, a Moncks Corner 200-amp service upgrade typically runs $3,000 to $4,500 including permit and disconnect fees. Federal Pacific or Zinsco replacements inside the home add another $600 to $1,200 depending on grounding and bonding work.

    Moncks Corner EV Charger Installation FAQs

    Can you tie an EV charger into my Foxbank generator?

    Yes, with proper load-shed configuration on the ATS. The generator sheds the EV load automatically during utility outages so the standby unit is not overloaded.

    Do you install EV chargers at Pinopolis lake-house docks?

    Yes. NEC 2026 wet-location and marine requirements apply and we install with marine-grade GFCIs, NEMA 3R enclosures, and hardwired coastal-rated Level 2 units.

    Nearby EV Charger Installation Areas

    Moncks CornerGoose CreekBonneauCordesvilleHanahan

    Also see our Charleston EV charging service hub or explore all our residential electrical services.

    Equipment & planning guide · Moncks Corner, SC

    Choosing a home charger and designing the charging circuit

    Use this guide to compare options before booking. For this work, the important starting points are your vehicle’s connector, everyday mileage, charging location, and available electrical capacity. Exact equipment selection follows an assessment of your property, the manufacturer’s instructions, and applicable local requirements.

    01

    Level 1, Level 2, and DC charging have different roles

    Level 1 uses a suitable 120-volt supply and can be practical when daily mileage is modest and long charging periods are available. Level 2 uses a 208- or 240-volt AC supply, depending on the installation, and provides a higher charging rate. DC fast charging supplies DC power to the vehicle and belongs to a different infrastructure category; a household wall connector is not a small DC fast charger.

    Actual charging performance depends on the vehicle’s onboard charger, the station’s configured limit, the supply, battery conditions, and other factors. A large advertised station rating does not mean every car will charge at that rate. The pictured Tesla Wall Connector is an actual AC charging product. Confirm the exact model and connector for your vehicle, and decide what daily charging performance you genuinely need before specifying the largest circuit.

    Wall Connector Gen 3 manufacturer product photo, Level 1, Level 2, and DC charging have different roles guide for Moncks Corner, SC
    Wall Connector Gen 3Product source: Tesla

    Manufacturer product photographs illustrate the equipment discussed, not completed EmergenServe installations. Models are examples; availability, specifications, and compatibility must be confirmed. Source attribution does not imply a manufacturer partnership.

    Moncks Corner: Coordinate outbuildings and lake-area equipment

    A workshop, well-related load, or exterior installation can change both circuit design and access requirements. Longer runs and separate structures deserve attention to conductor protection and the complete grounding and bonding arrangement. Around lake-area properties, the actual equipment exposure matters. Confirm whether the parcel is within town limits or under county administration, and use equipment documentation rather than assumptions about what a previous owner installed.

    For charging, assess your vehicle’s connector, everyday mileage, charging location, and available electrical capacity at the actual address. Confirm the parcel’s jurisdiction before scheduling work that requires a permit. Inspection or utility scheduling can affect completion; ask about the sequence rather than treating an estimated date as a guaranteed reconnection time.

    Prepare for a useful estimate

    • Provide the vehicle year, model, and charging-port type.
    • Choose where the car will normally park and where the cable should reach.
    • List future vehicles and other large electrical additions.

    Pricing depends on the agreed equipment, routing, access, existing conditions, and any required permits or utility work. Existing starting prices elsewhere on this page are not a quote for every configuration. Compare written scopes and confirm finish repairs, supplied materials, testing, and exclusions. No new price or manufacturer warranty is implied by the product examples in this guide.

    Contact Us

    Book Your Appointment Online

    Pick your service and a time that works for you below. Your request goes straight to our scheduling team. Prefer a full page? Open booking in a new tab.

    Call Us Directly

    (843) 754-1671

    Available for emergency calls 24/7

    Business Hours

    • Monday, Friday7am, 5pm
    • SaturdayBy Appointment
    • SundayClosed

    Emergency Services Available 24/7

    Why Charleston Trusts EmergenServe

    • Licensed, Bonded & Insured

      SC Commercial Contractor License #M118613. Active general liability and workers' comp coverage. COI sent to your GC, HOA, or closing attorney the same day you ask.

    • 5.0-Star Google Rated

      Google Screened and BBB Accredited with 33 real Google reviews from Charleston, Mount Pleasant, Summerville, and across the Lowcountry.

    • Upfront Flat-Rate Pricing

      Every job is priced before we lift a tool. No clock running, no surprise add-ons, no guessing what the bill will look like when we're done.

    • 100% Satisfaction Guarantee

      If something isn't right, we come back and fix it. Workmanship stands behind every breaker, outlet, fixture, and panel we install.

    EmergenServe, LLC BBB Business Review